Cyber risk belongs in your safety management system
IMO Resolution MSC.428(98) put cyber risk inside the ISM Code. Five years on, plenty of safety management systems still treat it as an IT annex bolted to the back.
Link 22 is usually introduced as the replacement for Link 11. That framing is accurate and almost useless, because it says nothing about what actually changes for the people running the network.
Link 22 is usually introduced as the replacement for Link 11. That framing is accurate and almost useless. It tells a project office what to put in a business case, but it says very little about what changes for the people who plan, run and troubleshoot the network.
The short version: Link 22 moves tactical data exchange from a single, centrally-polled net to a set of interconnected networks that carry data over long ranges without a relay aircraft. Most of the consequences follow from that one shift.
Link 11 uses a roll-call: a net control station polls each participant in turn, and the picture updates at whatever rate the poll allows. It works, and generations of operators have made it work well, but the throughput is bounded by the roll-call itself and the whole net depends on the control station.
Link 22 allocates time slots instead. Access to the media is scheduled, participants transmit in their own slots, and the network keeps running without a single unit acting as the hub. The practical effect is a more predictable update rate and no single point of failure in the media access scheme.
It also moves work from the operations room to the planning stage. A slot allocation is designed before the network runs, not negotiated during it, which is why network design and the OPTASK LINK become the load-bearing part of the job.
A Link 22 unit can participate in more than one network at a time, and networks can be joined into a larger structure so that data crosses between them. This is what allows a task group on UHF line-of-sight to be tied to units operating over HF at hundreds of miles, without an airborne relay in the middle.
For the operator, the interesting part is not the topology but the question it forces: which units need to see which data, and where should the boundaries between networks sit? Get that wrong and you have either a network carrying traffic nobody needs or a picture with a hole in it.
Link 22 uses the F-series messages, and a great deal of training time goes into them. In our experience that is rarely where programmes come unstuck.
What causes trouble is everything around the messages: crypto and key management, the fit between the Link 22 system and the host combat system, correlation and de-confliction where the same track arrives on more than one link, and the difference between what the standard permits and what a given platform has actually implemented.
Almost nobody operates Link 22 alone. It sits alongside Link 16, often Link 11 during transition, and JREAP over IP or satellite. The forwarding decisions between those links — what gets forwarded, by whom, in which direction, and what happens to a track that comes back round the loop — is where interoperability is won or lost.
This is why we teach Link 22 in a multi-link context rather than as a standalone subject. A unit that is perfect on its own network and wrong at the boundary is still a unit that puts a duplicate track into the coalition picture.
Three things are worth planning for early:
None of this is a reason to be cautious about Link 22. It is a considerable improvement on what it replaces. But the capability arrives through the planning and the integration, not through the standard on its own.